Construction Market Intelligence — September 4, 2026
July construction spending fell 3.8% y/y and input costs held at 7.1% — double the 3.5% rise in bid prices — as backlog slipped to 8.0 months and September Fed-hike odds jumped toward 60%.
4 articles on data centers
July construction spending fell 3.8% y/y and input costs held at 7.1% — double the 3.5% rise in bid prices — as backlog slipped to 8.0 months and September Fed-hike odds jumped toward 60%.
Contractor backlog broke to 8.0 months across every region and size, input costs held at 7.2% YoY, and the 30-year Treasury hit a 19-year high — data centers (+46%) alone are carrying demand.
Contractor backlog fell to an 8-month low and manufacturing construction is −21.4% YoY, even as tariffed-metal input costs rose 7.4%. A margin market, not a growth market.
A soft July jobs report drove the 10-year Treasury to 4.63% and a September cut back into play — even as construction spending fell 3.2% YoY and data-center delivery risk surfaced.