Solutions · Field Execution · 03 / 06Construction Operating System

One field record.
Complete execution visibility.

Connect daily reports, manpower, weather, RFIs, submittals, inspections, meetings, deficiencies, and punch-list activity into one live record of the work—from the jobsite through closeout.

The tools · Field Execution

Seven field tools. One record.

One project telling one story — the curtain-wall question you'll see here becomes a submittal, an inspection deficiency, a punch item and a meeting agenda line. Same thread. Same record.

ILLUSTRATIVE MOCKUP — NOT CUSTOMER DATA

01
Tool

Daily Logs

  • · Weather
  • · Manpower
  • · Deliveries
  • · Sections

The day, on the record.

Weather, manpower by trade, deliveries and field notes captured as the shift runs. The log closes signed and distributes itself — no evening rewrite.

writes → 42 workers on site
DAILY LOG · JUL 28● OPEN

Clear

74°F

6 mph

Dry

TradeCrewOn / Total
ConcreteMeridian14 / 112
SteelIronline18 / 144
GlazingClearSpan10 / 80
42 on site · 3 tradescloses signed · distributes
02
Tool

Gallery

  • · Time-stamped
  • · Located
  • · Linked to records
  • · Searchable

The visual record.

Field photos time-stamped, located and attached to the day, the area and the record they document — searchable long after the wall is closed.

writes → 84 photos attached
GALLERY · JUL 28 · LEVEL 6● SYNCED
L6·C
L6·D
L6·E
L6·F
L6·C
L6·D
L6·E
L6·F
84 photos · grid C–Fevery shot on a record
03
Tool

RFIs

  • · Ball-in-Court
  • · Linked Drawings
  • · Days Open
  • · Distribution

Questions that route themselves.

Requests for information carry their ball-in-court, their linked drawing and their days-open — and the answer attaches to the record it affects, not an inbox.

writes → RFI-045 logged
RFI LOG · JUL 28● OPEN 1 · HOT
RFI · SubjectBall-in-courtOpen
044 · Grid C beam detailArchitect2 d
045 · Curtain-wall anchor spacingStructural0 d
043 · Slab depression at MEPGC4 d
answer attaches to the recordno lost email
04
Tool

Submittals

  • · Review Workflow
  • · Revisions
  • · Ball-in-Court
  • · Stamped Decisions

Approvals with a workflow.

Packages move through a review workflow that is ours — sequential reviewers, ball-in-court, stamped decisions — with every revision on the same record.

writes → submittal received
SUBMITTALS · JUL 28● 2 OPEN
Package · RevReviewerStatus
Curtain wall system · 2ArchitectIn review
Structural anchors · 1StructuralApproved
Glazing samples · 1OwnerQueued
our workflow · not a plug-inevery rev on the record
05
Tool

Inspections

  • · Checklists
  • · Pass · Fail · N/A
  • · Auto-Deficiency
  • · Signed Result

Quality, checked and kept.

Checklist-driven inspections with pass, fail and N/A per line — a failed item opens a deficiency on the spot, and the signed result is the record.

writes → inspection passed
INSPECTION · SLAB POUR L6● SIGNED
  • Rebar spacing & cover

    Pass
  • Formwork alignment & bracing

    Pass
  • !

    Embed plate at grid D missing

    Deficiency
  • Post-tension stressing

    N/A
fail opens a deficiencysigned result = the record
06
Tool

Punch List

  • · Responsible Party
  • · Mark-Ready
  • · Approval
  • · Audit Trail

Deficiencies to closeout.

One item, one deficiency, one responsible party — private by default, tracked from mark-ready through approval, with the audit trail that proves it was fixed.

writes → 3 deficiencies opened
PUNCH LIST · LEVEL 6● 5 OPEN
# · DeficiencyPartyStatus
061 · Embed plate at grid DIronlineOpen
062 · Sealant gap, mullion 14ClearSpanReady
060 · Slab crack, bay 3MeridianApproved
private by defaultproof it was fixed
07
Tool

Meetings

  • · Agenda Builder
  • · Attendance
  • · Minutes
  • · Follow-ups

Coordination, on the record.

Agendas built from open items, attendance and timed minutes, follow-ups that carry to the next meeting — the coordination record, not a Word file emailed around.

writes → minutes recorded · log closed
OAC MEETING · JUL 28● MINUTES
  1. 1

    Curtain-wall lead time & RS-021 mitigation

    Structural
  2. 2

    CO-014 storefront revision — owner sign-off

    Owner
  3. 3

    Level 6 punch — 3 open deficiencies

    GC
  4. 4

    Three-week lookahead review

    GC
agenda from open itemsfollow-ups carry forward
Seven tools · One recordsyntecton.field-execution / tools — 2026

Today's log · Live

Watch the day write itself down.

Seven field tools, one record. Manpower, then photos, then open items — accumulating through the shift and closing to a signed daily log that distributes itself.

riverside tower · jul 28 · mock · today.log

Manpower

42 on site

Photos

84 attached

Open items

5

Last write

log closed

01writes

Daily Logs

Manpower counts 0 → 42 · log started

Weather, manpower by trade, deliveries and notes — captured as the shift runs.

02writes

Gallery

Photos count 0 → 84 · 84 photos attached

Time-stamped, located, attached to the day and the record they document.

03writes

RFIs

Open items → 1 · RFI-045 logged

The question routes with its ball-in-court, its drawing and its days open.

04writes

Submittals

Open items → 2 · submittal received

Packages move through a review workflow with revisions on the same record.

05writes

Inspections

Checklist signed · inspection passed

Checklist-driven pass · fail · N/A — a failure opens a deficiency on the spot.

06writes

Punch List

Open items → 5 · 3 deficiencies opened

One item, one deficiency, one responsible party — tracked to approval.

07writes

Meetings

Minutes recorded · log closed & distributed

The day closes signed. The account is complete and on the project.

1 record · every tradefield-execution.today / closed
Field crews on site — captured on the record

Captured on site — closed to the record

Why an operating system

By the end of the shift, the day wrote itself down.

Legacy field tools are a stack of apps that don't speak: the log in one, photos in another, RFIs in email, punch on a clipboard. The Construction Operating System keeps one record of the day — the manpower you logged, the photo you took, the RFI you raised, the deficiency the inspection opened — all on the same project, closing to a signed daily log that distributes itself.

PreconstructionFinancial ManagementProject ControlsField ExecutionProject RecordSafety & Compliance

Workflows

Field Workflows

daily logsweathermanpowerdeliveriesphotostime-stamped recordsrfisball-in-courtlinked drawingssubmittalsreview workflowrevisionsinspectionschecklistsauto-deficienciespunch listmark-readyapprovalsmeetingsagenda buildersigned daily log
Concrete frame at dusk — every trade, every day

Every trade, every day — one record

How Syntecton helps · Field Execution

One Day. One Log.

Legacy field tools scatter the shift across a stack of apps and clipboards that don't speak — and the log is rewritten in the evening from memory.

The Construction Operating System keeps the day on one record — the manpower, the photo, the RFI, the inspection, the punch, the meeting — closing to a signed daily log that distributes itself.

Field Execution is where the work of the day is captured, connected and closed — on the project the crew is on.

01Daily Logs
02Gallery
03RFIs
04Submittals
05Inspections
06Punch
07Meetings